Our Work
![](https://www.csn.asia/wp-content/uploads/2023/01/LINE_ALBUM_230104_14-300x400.jpg)
Structural work
Construction of the prefabricated fence wall of the reuse and recycling factory
Project value 1,000,000 baht
![](https://www.csn.asia/wp-content/uploads/2023/01/LINE_ALBUM_230104_62-300x400.jpg)
Air treatment system
Construction of a smoke treatment system from the rubber crushing process
Project value 2,140,000 baht
![](https://www.csn.asia/wp-content/uploads/2022/10/LINE_ALBUM_004-0082022-รางน้ำ-เบิร์ม-ปูตัวหนอน-TW_220921_30-534x400.jpg)
Structural work
Construction of rain gutters and speed ridges of the concentrated latex industry
Project value 428,000 bah
![](https://www.csn.asia/wp-content/uploads/2022/10/LINE_ALBUM_Finished_๒๓๐๓๑๕_92-533x400.jpg)
Architectural & Civil designs
Renovation work of fences and entrance doors in front of Chiranakorn Stadium, Hat Yai District, Songkhla Province
Project value 6,475,000 baht
![](https://www.csn.asia/wp-content/uploads/2022/10/LINE_ALBUM_งานรีโนเวทดราฟ-1-ตึกหาดใหญ่ทัทวิน_211206_14-400x400.jpg)
Architectural & Civil designs
Design and renovation of the factory’s executive office
Project value 3,300,000 baht
![](https://www.csn.asia/wp-content/uploads/2022/10/S__74719304-533x400.jpg)
Structural work
Construction of a sedimentation tank with a system and a wastewater reservoir
Project value 13,161,000 baht
![](https://www.csn.asia/wp-content/uploads/2022/10/LINE_ALBUM_0082021-ระบบบำบัดแอมโมเนีย-wet-scrubber-tatwin_220317_60-533x400.jpg)
System work
Construction of the Wet Scrubber air treatment system of the concentrated latex factory
Project value 2,418,200 baht
![](https://www.csn.asia/wp-content/uploads/2022/10/S__25018389-533x400.jpg)
Wastewater treatment system
Construction of rubber traps in the wastewater treatment system of the concentrated latex industry
Project value 535,000 baht
![](https://www.csn.asia/wp-content/uploads/2022/10/LINE_ALBUM_งานดาดคลองระบายน้ำ_211218_20-533x400.jpg)
Irrigation works - Drainage ditch
Construction of a rainwater drainage system and a wall to prevent erosion along the bank
Project value 6,979,610 baht
![](https://www.csn.asia/wp-content/uploads/2022/10/S__74752101-533x400.jpg)
Structural work
Construction of the foundation of the building to place machinery in the wastewater treatment system
Project value 240,000 baht
![](https://www.csn.asia/wp-content/uploads/2022/10/LINE_ALBUM_บ่อเติมอากาศ_220921_141-534x400.jpg)
Wastewater treatment system
Construction of a wastewater treatment pond of a concentrated latex factory
Project value 20,000,000 baht